4th CIRP Conference on Assembly Technologies and Systems

Event name
4th CIRP Conference on Assembly Technologies and Systems
 
Start date
20-05-2012
End date
22-05-2012
 
Location
Ann Arbor
Country
 
Event format Veranstaltungsformat
On Site

Publications Publikationen

Filter:
Subject:  Production Planning

Results 1-1 of 1 (Search time: 0.002 seconds).

PreviewAuthor(s)TitleTypeIssue Date
1März, Lothar ; Mayrhofer, Walter ; Sihn, Wilfried Beyond Human Tetris: Simulation-Based Optimization of Personnel Assignment Planning in Sequenced Commercial Vehicle AssemblyKonferenzbeitrag Inproceedings 2012