Wissenschaftliche Artikel

Melnyk, O., Huymajer, M., Huemer, C., Rosenberger, L., & Mazak-Huemer, A. (2025). A case study on integrating data analysis and process mining in conventional tunnel construction. Developments in the Built Environment, 22, 100640. https://doi.org/10.1016/j.dibe.2025.100640 ( reposiTUm)
Melnyk, O., Huymajer, M., Fenzl, D., Huemer, C., Wenighofer, R., & Mazak-Huemer, A. (2024). Augmented reality for enhanced documentation and anchor inspection reporting in conventional tunnelling. Tunnelling and Underground Space Technology, 153, 1–16. https://doi.org/10.1016/j.tust.2024.106040 ( reposiTUm)
Huymajer, M., Melnyk, O., Wenighofer, R., Huemer, C., & Galler, R. (2024). Building Information Modeling in the execution phase of conventional tunneling projects. Tunnelling and Underground Space Technology, 146, 1–15. https://doi.org/10.1016/j.tust.2023.105539 ( reposiTUm)
Huymajer, M., Paskaleva, G., Wenighofer, R., Huemer, C., & Mazak-Huemer, A. (2024). IFC concepts in the execution phase of conventional tunneling projects. Tunnelling and Underground Space Technology, 143, Article 105368. https://doi.org/10.1016/j.tust.2023.105368 ( reposiTUm)
Melnyk, O., Raab, J., & Lulei, F. (2023). ÖNORM B 2203-1 as a Supplement to FIDIC Emerald Book in Conventional Tunnel Construction. Buildings, 13(7), Article 1837. https://doi.org/10.3390/buildings13071837 ( reposiTUm)
Galler, R., Huemer, C., Bednar, T., Huymajer, M., Wenighofer, R., Paskaleva, G., Steiner, B., & Melnyk, O. (2023). Aktuelle Forschung im Bereich der Digitalisierung des konventionellen Tunnelbaus. BHM Berg- und Hüttenmännische Monatshefte, 168, 601–607. https://doi.org/10.1007/s00501-023-01409-5 ( reposiTUm)
Winkler, L., Melnyk, O., & Goger, G. (2022). Prerequisites for BIM-based Invoicing in NATM Projects. Geomechanics and Tunnelling, 15(3), 279–283. https://doi.org/10.1002/geot.202100067 ( reposiTUm)
Wenighofer, R., Eder, N., Speckmoser, V., Villeneuve, M., Winkler, L., & Galler, R. (2022). Adaptive and parameterised 3D BIM model for the tunnel tender and excavation phase. Geomechanics and Tunnelling, 15(3), 272–278. https://doi.org/10.1002/geot.202100075 ( reposiTUm)
Paskaleva, G., Niedermoser, C., Vierhauser, M., Mazak‐Huemer, A., Hruschka, S., & Huemer, C. (2022). Data Drops for Tunnel Information Modelling. Geomechanics and Tunnelling, 15(3), 267–271. https://doi.org/10.1002/geot.202100061 ( reposiTUm)
Huymajer, M., Operta, D., Mazak-Huemer, A., & Huemer, C. (2022). The Tunneling Information Management System – A tool for documenting the tunneling process in NATM projects. Geomechanics and Tunnelling, 15(3), 259–264. https://doi.org/10.1002/geot.202100064 ( reposiTUm)
Mazak-Huemer, A., Galler, R., Wenighofer, R., Vierhauser, M., & Huemer, C. (2020). BIM-basierte digitale Transformation im Untertagebau anhand von zwei anwendungsorientierten Forschungsprojekten. BHM Berg- und Hüttenmännische Monatshefte, 165(12), 658–665. https://doi.org/10.1007/s00501-020-01053-3 ( reposiTUm)

Beiträge in Tagungsbänden

Melnyk, O., Huymajer, M., Huemer, C., & Galler, R. (2023). Digitalization in the Construction Industry: The Case of Documentation and Invoicing in Tunneling. In 2023 IEEE 25th Conference on Business Informatics (CBI) (pp. 1–10). IEEE. https://doi.org/10.1109/CBI58679.2023.10187588 ( reposiTUm)

Präsentationen

Melnyk, O. (2023, May 24). Digitization and Future Challenges of Conventional Tunnel Construction [Presentation]. Seminar on the Future of Construction Processes, Austria. ( reposiTUm)
Melnyk, O. (2023, September 5). Tunnelbau und BIM: Aktuelle Forschungsarbeiten an der TU Wien [Presentation]. Der interuniversitäre Workshop zur Baubetriebsforschung der TU Wien, Wien, Austria. http://hdl.handle.net/20.500.12708/188504 ( reposiTUm)
Melnyk, O., Huymajer, M., Huemer, C., & Galler, R. (2023, June 22). Digitalization in the Construction Industry: The Case of Documentation and Invoicing in Tunneling [Conference Presentation]. IEEE CBI 2023, Prague, Czechia. http://hdl.handle.net/20.500.12708/187147 ( reposiTUm)

Berichte

Melnyk, O., Huymajer, M., Weichenberger, F., Wenighofer, R., Galler, R., & Huemer, C. (2024). Interdisziplinäres BIM_basiertes Planungs-, Bau- und Betriebsprozessmanagement im Tunnelbau (No. 48579106). http://hdl.handle.net/20.500.12708/210668 ( reposiTUm)
Melnyk, O., Wenighofer, R., Flandera, T., Mierzejek, M., & Niedermoser, C. (2023). BIM Abwicklungsplan – BAP für Tunnelbauprojekte. Österreichische Bautechnik Vereinigung. http://hdl.handle.net/20.500.12708/190434 ( reposiTUm)
Melnyk, O., Wenighofer, R., & Mierzejek, M. (2023). BIM Modellierungsleitfaden für Tunnelbauprojekte. Leitfaden. Österreichische Bautechnik Vereinigung. http://hdl.handle.net/20.500.12708/190432 ( reposiTUm)
Melnyk, O., Wenighofer, R., Niedermoser, C., Mierzejek, M., & Flandera, T. (2023). Auftraggeber-Informationsanforderungen - AIA für Tunnelbauprojekte. Österreichische Bautechnik Vereinigung. http://hdl.handle.net/20.500.12708/190433 ( reposiTUm)