Soltani, S., Schauer, B., Obweger, W., Illenseer, S. L., Bischof, M., Egbo, L., Haferl, M., Freitas, A., & Pinho, I. (2025). Future Control Systems: Requirements, Framework and Benefits (D5.1). http://hdl.handle.net/20.500.12708/225394
AI (Artificial Intelligence); ATC (Automatic Train Control); CBTC (Communications-Based Train Control); Fully Automated Operations (GoA4 – Grade of Automation 4); PIS (Passenger Information System); SIL (Safety Integrity Level); T2G (Train-to-Ground); TCMS (Train Control and Monitoring System); TCN (Train Communication Network); TRDP (Train Real-time Data Protocol); WLAN (Wireless Local Area Network)
en
Project title:
Next-Gen Technologies For Enhanced Metro Operations: 101177985 (European Commission)
-
Research Areas:
Sustainable and Low Emission Mobility: 60% Sustainable Production and Technologies: 40%