<div class="csl-bib-body">
<div class="csl-entry">Altay, S., & Arıkan, E. (2026). Managing supply delays with advance orders and contingent expediting in a single-period inventory model. <i>Operations Research Letters</i>, <i>69</i>, 1–10. https://doi.org/10.1016/j.orl.2026.107508</div>
</div>
-
dc.identifier.issn
0167-6377
-
dc.identifier.uri
http://hdl.handle.net/20.500.12708/230744
-
dc.description.abstract
We study a single-period newsvendor with an advance order from a low-cost supplier with random lead time and a contingent backup order from a reliable, costlier source placed at time τ < T if needed. The resulting two-stage problem is concave and admits simple critical-fractile/threshold policies driven by conditional delivery probabilities. We characterize when to use only the reliable source, only the unreliable source, or both. We further analyze the effect of the backup-order timing, giving monotonicity conditions and identifying when the initial and backup orders can be non-monotone, with numerical examples for illustration.
en
dc.language.iso
en
-
dc.publisher
ELSEVIER
-
dc.relation.ispartof
Operations Research Letters
-
dc.subject
Dual-sourcing
en
dc.subject
Lead time uncertainty
en
dc.subject
Newsvendor
en
dc.subject
Operations Research
en
dc.subject
Production Planning
en
dc.title
Managing supply delays with advance orders and contingent expediting in a single-period inventory model