<div class="csl-bib-body">
<div class="csl-entry">Auer, S., Mayrhofer, W., & Sihn, W. (2012). Implementation of a Comprehensive Production Planning Approach in Special Purpose Vehicle Production. In G. Chryssolouris & D. Mourtzis (Eds.), <i>45th CIRP Conference on Manufacturing Systems 2012</i> (pp. 43–48). Elsevier BV. https://doi.org/10.1016/j.procir.2012.07.009</div>
</div>
-
dc.identifier.uri
http://hdl.handle.net/20.500.12708/164142
-
dc.description.abstract
The European vehicle industry employs a cascading planning process, for medium-term sales and operations and medium- to shortterm
production planning. Due to a lack of coordination and feedback between the different planning phases, costly problems in
production arise. This paper describes an integrated planning solution for the harmonisation of sales, purchasing, supply chain and
production planning along the planning cascade. By harmonizing long-, medium- and short-term planning, cost savings and
additional value potential can be realized. The basic approach for harmonized planning is illustrated with a case study from special
purpose vehicle production.
en
dc.relation.ispartofseries
Procedia CIRP
-
dc.subject
General Materials Science
-
dc.subject
Automotive
-
dc.subject
Planning
-
dc.subject
Sequencing
-
dc.title
Implementation of a Comprehensive Production Planning Approach in Special Purpose Vehicle Production
-
dc.type
Konferenzbeitrag
de
dc.type
Inproceedings
en
dc.relation.publication
45th CIRP Conference on Manufacturing Systems 2012
-
dc.description.startpage
43
-
dc.description.endpage
48
-
dc.type.category
Full-Paper Contribution
-
tuw.booktitle
45th CIRP Conference on Manufacturing Systems 2012