Auer, S., Mayrhofer, W., & Sihn, W. (2012). Implementation of a Comprehensive Production Planning Approach in Special Purpose Vehicle Production. In G. Chryssolouris & D. Mourtzis (Eds.), 45th CIRP Conference on Manufacturing Systems 2012 (pp. 43–48). Elsevier BV. https://doi.org/10.1016/j.procir.2012.07.009
45th CIRP Conference on Manufacturing Systems 2012
-
Volume:
3
-
Date (published):
2012
-
Event name:
45th CIRP Conference on Manufacturing Systems 2012
-
Event date:
16-May-2012 - 18-May-2012
-
Event place:
Athen, Greece
-
Number of Pages:
6
-
Publisher:
Elsevier BV
-
Keywords:
General Materials Science; Automotive; Planning; Sequencing
-
Abstract:
The European vehicle industry employs a cascading planning process, for medium-term sales and operations and medium- to shortterm
production planning. Due to a lack of coordination and feedback between the different planning phases, costly problems in
production arise. This paper describes an integrated planning solution for the harmonisation of sales, purchasing, supply chain and
production planning along the planning cascade. By harmonizing long-, medium- and short-term planning, cost savings and
additional value potential can be realized. The basic approach for harmonized planning is illustrated with a case study from special
purpose vehicle production.