Altay, S., & Arıkan, E. (2026). Managing supply delays with advance orders and contingent expediting in a single-period inventory model. Operations Research Letters, 69, 1–10. https://doi.org/10.1016/j.orl.2026.107508
E105-01 - Forschungsbereich Risikomanagement in Finanz- und Versicherungsmathematik E105-05 - Forschungsbereich Stochastische Finanz- und Versicherungsmathematik
-
Journal:
Operations Research Letters
-
ISSN:
0167-6377
-
Date (published):
2026
-
Number of Pages:
10
-
Publisher:
ELSEVIER
-
Peer reviewed:
Yes
-
Keywords:
Dual-sourcing; Lead time uncertainty; Newsvendor; Operations Research; Production Planning
en
Abstract:
We study a single-period newsvendor with an advance order from a low-cost supplier with random lead time and a contingent backup order from a reliable, costlier source placed at time τ < T if needed. The resulting two-stage problem is concave and admits simple critical-fractile/threshold policies driven by conditional delivery probabilities. We characterize when to use only the reliable source, only the unreliable source, or both. We further analyze the effect of the backup-order timing, giving monotonicity conditions and identifying when the initial and backup orders can be non-monotone, with numerical examples for illustration.
en
Research Areas:
Mathematical Methods in Economics: 80% Modeling and Simulation: 20%